more suitable for repair work than what was previously available. This dozer, shown below, <br />is equipped with a 9-10 foot wide blade and has more than adequate power to complete <br />much of the work necessary. <br />y. <br />Maintenance work completed also includes restoring design conditions of the upper east <br />ditch (shown first below), the west terrace bench on Fill 7 (shown next), gully repair above <br />Pond 6 (shown next), and gully repair above the west downdrain to Fill 7 (shown last). <br />Downdrain repair at all of the three fills is outstanding at this time and will require the <br />excavator which is currently working at the New Elk Mine. This work should be completed <br />during optimum ground conditions this fall. <br />The operator should also provide a response to the Division's letter dated March 25, 2009 <br />regarding specific requirements of the reclamation plan, including a schedule for completion, <br />or submittal, of the required information as necessary. <br />Ditches on the east side of the reclaimed area have been restored to design conditions with <br />the exception of the steep ditch above the road to pond 9. We discussed the potential to <br />revise the drainage in this area to effective split the drainage from some of the Pond 9 <br />watershed. The operator will submit a revision proposing some changes to improve the <br />permanent drainage in this area.