My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-23_REVISION - C1981018 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2009-09-23_REVISION - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:43 PM
Creation date
9/25/2009 1:41:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
9/23/2009
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
TR67
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />September 23, 2009 <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Scott Wandstedt <br />Ronald W. Cattany <br />Blue Mountain Energy, Inc Division Director <br />3607 County Road 65 Natural Resource Trustee <br />Rangely, CO 81648 <br />Re: Deserado Mine (Permit No. C-1981-018) <br />Proposed Decision - Technical Revision No. 67 (TR-67) <br />Addition of 4 Degas Bore Holes, One Return Shaft and One Light Use Road to RDH-3 <br />Dear Mr. Wandstedt: <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for Technical <br />Revision No. 67 at the Deserado Mine. Notice of the proposed decision will be published in the Rio <br />Blanco Herald-Times as soon as possible. The first publication will initiate the ten (10) day public <br />comment period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. This Technical Revision must not be implemented until this <br />proposed decision becomes final and until any required increase in bond is submitted to and approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />C Jason D. usick <br />Environmental Protection Specialist <br />Enclosure <br />cc: Carl Johnston, Office of Surface Mining, with enclosures <br />C-TO*CP41018 JDM_09232009121703.doc Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.