My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-22_REVISION - M1979131
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979131
>
2009-09-22_REVISION - M1979131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:20:34 PM
Creation date
9/25/2009 7:35:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979131
IBM Index Class Name
REVISION
Doc Date
9/22/2009
Doc Name
Submittal
From
Korinek Sand and Gravel
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 2. Mining Timetable <br />11 <br />The following table (Table D-2) is a best estimate of the sequence of operations for the life of the <br />mine and is based on mining and selling an amount of 30,000 tons per year. <br />Table D-2 Morfitt Pit Mining Sequence <br /> Length of time to <br />Task Comments <br /> complete months <br />1 Phase 1 topsoil stripping, reclamation of the 2 <br />0 <br /> western slope of the existing it. . <br />2 Mine Abase 1, strip topsoil and overburden from 14 <br />4 <br /> phase 2. . <br /> <br />3 Mine phase 2, strip topsoil and overburden from <br />18 <br />1 <br /> phase 3, and reclaim phase 1. . <br /> <br />4 Mine phase 3, strip topsoil and overburden from <br />33 <br />2 <br /> hase 3, and reclaim hase 2. . <br /> <br />5 Mine phase 4, strip topsoil and overburden from <br />29 <br />0 <br /> phase 5, and reclaim phase 3. . <br />6 Mine phase 5, strip topsoil and overburden from 2 <br />7 <br /> phase 6, and reclaim phase 4. . <br /> Mine phase 6, strip topsoil and overburden from <br />14 <br />9 <br /> phase 7, and reclaim phase 5. . <br /> <br />8 Mine phase 7, strip topsoil and overburden from <br />25 <br />7 <br /> phase 8, and reclaim phase 6. ' <br /> <br />9 Mine phase 8, strip topsoil and overburden from <br />27 <br />3 <br /> hase 9, and reclaim phase 7. ' <br />10 Mine phase 9, and reclaim phase 8. 19.8 <br /> <br />11 Reclaim phase 9 and remainder of pre-law mine <br />2 <br />0 <br /> site on the east side of the permit. . <br />12 Reclaim scrapyard and facilities areas. 1.0 <br />Total (months) 192.5 <br />Total (years) 16.0 <br />The mining schedule is planned to minimize disturbance by reclaiming areas as additional mining <br />is undertaken. This table is based on a reasonable projection of average production rates. The table <br />shows that mining will occur over approximately 16.0 years. This timeline is based on the <br />maximum annual production of 30,000 tons of gravel. Shale mining will not be a determining <br />factor in production or mine life. <br />Korinek 91 Pit August 2009 D-4