My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-22_INSPECTION - M1986048
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1986048
>
2009-09-22_INSPECTION - M1986048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:42 PM
Creation date
9/24/2009 7:55:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986048
IBM Index Class Name
INSPECTION
Doc Date
9/22/2009
Doc Name
Insp Rpt
From
DRMS
To
Reese Contracting
Inspection Date
9/9/2009
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) <br />MINE ID # OR PROSPECTING ID #: NA-1486-nAk <br />INSPECTION DATE: 9/949 INSPECTOR=S INITIALS: MAC <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />Erosion has formed rills and gullies along the reclaimed pit wall. The Operator has failed to in/ R / n9 <br />stabilize all surface areas of the affected land to effectively control erosion per the <br />requirements of Rule 3.1.6(3) <br />PB or PV: PR <br />TOPIC(S): S_ <br />Corrective actions are to: <br />The Operator shall repair the rills and gullies that have formed on the reclaimed pit wall. In <br />addition, the Operator shall implement erosion control measures such as straw bales, silt <br />fences, or revegetation of the slopes to effectively control the erosion. The Operator shall <br />repair the rills and gullies on or before October 8, 2009 and proof of compliance must be <br />submitted by the same date. Proof of compliance may be in the form of photographs or the <br />Operator may request a follow up inspection.
The URL can be used to link to this page
Your browser does not support the video tag.