My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-22_PERMIT FILE - M2009054
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009054
>
2009-09-22_PERMIT FILE - M2009054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:42 PM
Creation date
9/24/2009 7:55:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009054
IBM Index Class Name
PERMIT FILE
Doc Date
9/22/2009
Doc Name
Adequacy Review #1
From
DRMS
To
Banks and Gesso, LLC
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-Based on the "point of maximum reclamation" described in Exhibit L and the plan for <br />importing growth media to augment the topsoil, the Division will need to hold a bond for <br />importing this material. Based on the December, 2008 inspection, it appeared little to no <br />topsoil/growth media was stockpiled on the site for reclamation. Is this still the case? If <br />not, please estimate how much growth media is currently on the site for reclamation. <br />Publication and Notices <br />-In accordance with Rule 1. 6.2 (d) & (e) and Rule 1.6.5, within ten (10) days after the <br />application was deemed complete and submitted, you must have published a notice in a <br />newspaper of general circulation in the locality of the proposed mining operation once a <br />week for four (4) consecutive weeks. Also, immediately after the first publication you <br />were to mail a copy of the notice to all owners of record of surface and mineral rights <br />holders of any recorded easements and all owners of record of lands that are within 200 <br />feet of the boundary of the affected land. Proof of notice and mailings such as Certified <br />Mail Return Receipt Requested must be submitted to the Division of Reclamation Mining <br />and Safety prior to the decision date. <br />This concludes the Division's preliminary adequacy review of this application. Please <br />remember that the decision date for this application is October 25th, 2009. As previously <br />mentioned if you are unable to provide satisfactory responses to any inadequacies prior to <br />this date, it will be your responsibility to request an extension of time to allow for <br />continued review of this application. If there are still unresolved issues when the <br />decision date arrives and no extension has been requested, the application will be denied. <br />If you have any questions, please contact me at (303) 866-3567 ext. 8120. <br />Sincerely, <br />Jared Ebert <br />Environmental Protection Specialist <br />Cc: Denise Gonzales, All Rite Paving and Redi-Mic. Inc. <br />Tony Waldron, DRMS
The URL can be used to link to this page
Your browser does not support the video tag.