Laserfiche WebLink
i '. <br />NOTICE OF INTENT TO CONSTRUCT A NON-JURISDICTIONAL <br />WATER IMPOUNDMENT STRUCTURE <br />This notice is required per Section 37-87-125, C.R.S. (1998). <br />This notice must be submitted to the Division Engineer's Office a minimum of 45 days prior to construction. <br />(PLEASE PRINT OR TYPE NOTICE) <br />OWNER INFORMATION <br />Name: Mountain Coal Company. L.L.C. Telephone: 97 929-5015 <br />Address: P.O. Box 591 Somerset CO 81434 <br />Street / P.O. Box/ Rural Route City State Zip Code <br />Responsible Person: Kathleen G.Melt Telephone: ( 970 ).929-2238 <br />Address:. (same) <br />Street / P.O. Box/ Rural Route City State Zip Code <br />Contractor: N/A Telephone: <br />STRUCTURE INFORMATION <br />Name of Dam: Pond MB-5E (two-celled bond) Water Division: 4 Water District: 40 <br />Location: J? <br />@ Option 1 / <br />OR <br />e Option 2-e• <br />Dam Dimensions: Vertical Himiinht 9.8 ft., Length: 240 ft., Slopes: U/S: 1.5:1 H:1 V, D/S 1.5:1 H:1 V <br />C+.S4f4w) (both cells combined) <br />Reservoir: Surface Area . 6.0 acres, Capacity"$ 20.4 acre feet, Drainage Area: 90.0 acres <br />Emeroencv Spillway: Width: 20.0 ft., Side Slopes: 2:1 HAV, Freeboard4: 2.0 ft <br />Outlet Drain: Type: canal hate on CMP Size: .12.0 inches, Location: west end of both pond cells <br />Stream Name or Water Sources: Water of and/or stormwater water tributary to the N. Fork of the Gunnison River <br />Proposed Water Use: Stormwater sediment retention and/or wate rights a Court Case No. 03CW08 <br />08/06/09 <br />Signature f Owner Date <br />DIVISION ENGINEER'S REQUIREMENTS: me w.eqA& <br />DWR (03/07) <br /> <br />Signature of DRIsion Engineer Date <br />1 ANon,Jurisdktlonal Structure` is a dam creating a reservoir with a capacity of 100 acre-feet or less and a surface area of 20 acres or less and a vertical height (see <br />footnote 3) of 10 feet or less. <br />Please see example on reverse side (or page 2) of this form. <br />3 "Vertical Height" is measured from the elevation of the lowest point of the natural surface of the ground where that point occurs along the longitudinal centerline of the dam <br />up to the crest of the emergency spillway of the dam. <br />4 Treeboard' is the vertical distance from the bottom of spillway to the crest of ft dam. <br />5 if constnwylon in reservoir Intercepts groundwater, a well permit is required. (Well permit applications an be found at www.water.state.co.us/pubs/fomws.asp) <br />Jw B?i6??9 <br />r OFFICE OF THE STATE ENGINEER <br />DMSION OF WATER RESOURCES <br />303-868.3581