Laserfiche WebLink
<br /> <br />CONSULTING GEOTECHtilCAL ENGINEERS AND MATERIAL TESTING <br />DAILY E: I E LD _REPORT <br />PROJECT NUMLER M90016MT DATE 11-1-90 Thursday <br />PROJECT NAME Gob pile Stud: TECHNICIAN D. Dostaler <br />PROJECT LOCATION Somerset WEATHER CONDITIONS cloudy, breezy, <br />cool <br />WORK REQUESTED Density tests <br />CLIENT West Elk Coal Coapany <br />CONTRACTOR West Elk Cbal FOREMAN tor. Mike Price <br />WORK PERFORK$D BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site at 2:15p.m. as requested <br />by Mr. Mike Price. I performed soil moisture content and <br />soil density tests as requested by Mr. Price of material <br />being Placed on gob hill using nuclear soil density test <br />metho4s. ?lease refer to the test results sheet for approx- <br />imate test locations and test results. The test results <br />were verbally liven to Mr. Mike Price of West Elk Coal at <br />the time of our site visit. The test results indicate only <br />the relative compaction and soil moisture content pf the <br />material tested at the elevation and location tested at <br />the time of our site visit. <br />P.O Box 3908 P O BOX 0445 <br />GRAND JUNG ION. CO &1502 MoNTROSE. Co 81402 <br />(3m) 245,6506 t36M 249.2164 <br /> <br />4&3 TuaNER. 104 A <br />oLtAANGo. Co a t3aI <br />00259.5095