Laserfiche WebLink
Demolition Work <br />Protect Identification <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />Task #: mmm <br />Permit/Job#: C-80-007 <br />Date: 911012009 <br />Abbreviation: N/A <br />User: TAK Site: West Elk Mine Filename: <br />Permitting action: TR-118 Source of unit costs: CIRCES <br />Task description: Demolish and remove all structures related to coal processing plant Location adjustment: 99.50% <br />STRUCTURE or ITEM DESCRIPTION <br />Coal preparation plant <br />Structure <br />Floor <br />Footing <br />Water supply line <br />Water discharge line <br />Control/Lab Building <br />Refuse Truck Bin <br />Refuse Truck Bin Foundation <br />TC-1 Conveyor <br />TC-1 Conveyor Bent Foundation <br />PR-2 Conveyor <br />PR-2 Conveyor Bent Foundation <br />PR-2 Conveyor Micro Piles <br />PR-2 Conveyor Take-up Tower <br />TC-1/PR-2 Transfer Structure <br />TC-1/PR-2 Transfer Structure Foundation <br />P-6 Conveyor <br />PP4 Conveyor <br />PP4 Conveyor Bent Foundations <br />Page 1 of 1 <br /> Last unit cost update: 2009 <br /> QUANTITY UNIT CIRCES DEMO. MENU SELECTION UNIT COST TOTAL COST % LIAB TOTAL <br />ft ft ft If in (100% LIAB) . (ACTUAL) <br />109 40 148 645,280 SF Plant (3S) demo./on-site dispos. exc. pit - Max. 10,000 ft. haul $0.23 $149,059.68 100% $149 <br />059 <br />68 <br />84 112 24 9,408 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $32,645.76 100% , <br />. <br />$32 <br />645 <br />76 <br /> 1 2 308 616 LF Demo/disp./exc. pit, 1'X2'- 200 ft. $6.94 $4,275.04 100% , <br />. <br />$4,275.04 <br /> 2300 8 2,300 LF Pipe, sewer/water-12 in. diam. $6.22 $14,306.00 100% $14 <br />306.00 <br /> 300 12 300 LF Pipe, sewer/water - 12 in. diam. $6.22 $1,866.00 100% , <br />$1,866.00 <br />50 40 30 60,000 CF Demo/disp./exc. pit - 10K' haul $0.20 $12,060.00 100% $12 <br />060 <br />00 <br />42 52 12 2,184 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $7,578.48 100% , <br />. <br />$7 <br />578 <br />48 <br /> 1 2 308 308 LF Demo/disp./existing pit, 1'X2'- 200 ft. $6.78 $2,088.24 100% , <br />. <br />$2,088.24 <br />20 20 60 24,000 CF Demo/disp./exc. pit - 10K' haul $0.24 $5,712.00 100% $5 <br />712 <br />00 <br />20 20 12 400 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $1,388.00 100% , <br />. <br />$1,388.00 <br /> 7 350 350 LF Conveyor, overland - 8'W x 10' H $24.79 $8,676.50 100% $8 <br />676 <br />50 <br />8 2 4 64 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $222.08 100% , <br />. <br />$222.08 <br /> 10 2000 2,000 LF Conveyor, overland - 8'W x 10'H $24.79 $49,580.00 100% $49 <br />580 <br />00 <br />160 6 4 3,840 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $13,324.80 100% , <br />. <br />$13 <br />324 <br />80 <br />240 2 2 960 LF Demo/disp./exc. pit, 1.5'X3' - 200 ft. $15.61 $14,985.60 100% , <br />. <br />$14 <br />985 <br />60 <br />24 20 80 38,400 CF Demo/disp./exc. pit -1 OK' haul $0.20 $7,718.40 100% , <br />. <br />$7,718.40 <br />20 20 40 16,000 CF Demo/disp./exc. pit - 10K' haul $0.20 $3,216.00 100% $3 <br />216 <br />00 <br />20 20 12 400 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $1,388.00 100% , <br />. <br />$1,388.00 <br /> 8 200 200 LF Conveyor, overland - 8'W x 10'H $24.79 $4,958.00 100% $4,958.00 <br /> 8 550 550 LF Conveyor, overland - 8'W x 10'H $24.79 $13,634.50 100% $13 <br />634 <br />50 <br />10 2 4 80 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $277.60 100% , <br />. <br />$277.60 <br />Building <br />Floor <br />Footing <br />Total for this page before location adjustment $348,960,68 <br />Location adjustment: 99.50% Total for this page after location adjustment $347,215.86 <br />Grand total for this task after location adjustment $347,215.88