Demolition Work
<br />Protect Identification
<br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety
<br />Task #: mmm
<br />Permit/Job#: C-80-007
<br />Date: 911012009
<br />Abbreviation: N/A
<br />User: TAK Site: West Elk Mine Filename:
<br />Permitting action: TR-118 Source of unit costs: CIRCES
<br />Task description: Demolish and remove all structures related to coal processing plant Location adjustment: 99.50%
<br />STRUCTURE or ITEM DESCRIPTION
<br />Coal preparation plant
<br />Structure
<br />Floor
<br />Footing
<br />Water supply line
<br />Water discharge line
<br />Control/Lab Building
<br />Refuse Truck Bin
<br />Refuse Truck Bin Foundation
<br />TC-1 Conveyor
<br />TC-1 Conveyor Bent Foundation
<br />PR-2 Conveyor
<br />PR-2 Conveyor Bent Foundation
<br />PR-2 Conveyor Micro Piles
<br />PR-2 Conveyor Take-up Tower
<br />TC-1/PR-2 Transfer Structure
<br />TC-1/PR-2 Transfer Structure Foundation
<br />P-6 Conveyor
<br />PP4 Conveyor
<br />PP4 Conveyor Bent Foundations
<br />Page 1 of 1
<br /> Last unit cost update: 2009
<br /> QUANTITY UNIT CIRCES DEMO. MENU SELECTION UNIT COST TOTAL COST % LIAB TOTAL
<br />ft ft ft If in (100% LIAB) . (ACTUAL)
<br />109 40 148 645,280 SF Plant (3S) demo./on-site dispos. exc. pit - Max. 10,000 ft. haul $0.23 $149,059.68 100% $149
<br />059
<br />68
<br />84 112 24 9,408 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $32,645.76 100% ,
<br />.
<br />$32
<br />645
<br />76
<br /> 1 2 308 616 LF Demo/disp./exc. pit, 1'X2'- 200 ft. $6.94 $4,275.04 100% ,
<br />.
<br />$4,275.04
<br /> 2300 8 2,300 LF Pipe, sewer/water-12 in. diam. $6.22 $14,306.00 100% $14
<br />306.00
<br /> 300 12 300 LF Pipe, sewer/water - 12 in. diam. $6.22 $1,866.00 100% ,
<br />$1,866.00
<br />50 40 30 60,000 CF Demo/disp./exc. pit - 10K' haul $0.20 $12,060.00 100% $12
<br />060
<br />00
<br />42 52 12 2,184 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $7,578.48 100% ,
<br />.
<br />$7
<br />578
<br />48
<br /> 1 2 308 308 LF Demo/disp./existing pit, 1'X2'- 200 ft. $6.78 $2,088.24 100% ,
<br />.
<br />$2,088.24
<br />20 20 60 24,000 CF Demo/disp./exc. pit - 10K' haul $0.24 $5,712.00 100% $5
<br />712
<br />00
<br />20 20 12 400 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $1,388.00 100% ,
<br />.
<br />$1,388.00
<br /> 7 350 350 LF Conveyor, overland - 8'W x 10' H $24.79 $8,676.50 100% $8
<br />676
<br />50
<br />8 2 4 64 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $222.08 100% ,
<br />.
<br />$222.08
<br /> 10 2000 2,000 LF Conveyor, overland - 8'W x 10'H $24.79 $49,580.00 100% $49
<br />580
<br />00
<br />160 6 4 3,840 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $13,324.80 100% ,
<br />.
<br />$13
<br />324
<br />80
<br />240 2 2 960 LF Demo/disp./exc. pit, 1.5'X3' - 200 ft. $15.61 $14,985.60 100% ,
<br />.
<br />$14
<br />985
<br />60
<br />24 20 80 38,400 CF Demo/disp./exc. pit -1 OK' haul $0.20 $7,718.40 100% ,
<br />.
<br />$7,718.40
<br />20 20 40 16,000 CF Demo/disp./exc. pit - 10K' haul $0.20 $3,216.00 100% $3
<br />216
<br />00
<br />20 20 12 400 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $1,388.00 100% ,
<br />.
<br />$1,388.00
<br /> 8 200 200 LF Conveyor, overland - 8'W x 10'H $24.79 $4,958.00 100% $4,958.00
<br /> 8 550 550 LF Conveyor, overland - 8'W x 10'H $24.79 $13,634.50 100% $13
<br />634
<br />50
<br />10 2 4 80 SF Demo.disp exc. pit, 12" th. - 200 ft. $3.47 $277.60 100% ,
<br />.
<br />$277.60
<br />Building
<br />Floor
<br />Footing
<br />Total for this page before location adjustment $348,960,68
<br />Location adjustment: 99.50% Total for this page after location adjustment $347,215.86
<br />Grand total for this task after location adjustment $347,215.88
|