Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 072 <br />Date : 0710712009 <br />User : JDM <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State : Colorado <br />County:Moffat <br />Site : Trapper Mine <br />Permit/job # :C-1981-010 <br />Abbreviation :none <br />Filename :C010-072 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action :Permit Revision 06 <br />Task description : Rip G5 Hautroad <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Utilization % <br />$95.00 NA <br />$138.49 100 <br />$8.66 100 <br />$32.78 NA <br />$274.92 Total fleet cost/hour : $1,099.69 <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : <br />Area : <br />NA NA <br />3.00 acres <br />Load factor : NA Bank volume <br />Rip depth (ft) : 2.50 Volume <br />NA <br />12,100 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :Appendix A Table 1.4-5 <br />Source of estimated load factor :NA <br /> <br /> <br />HOURLY PRODUCTION w._ <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity: NA feettsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 4,060.03 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.50 feet/pass Site altitude : 6,400 feet <br />Average ripping width : 8.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 500.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 1.007 acres/hour Adjusted unit production : 3,369.82 cu. yds./hour <br />Unadjusted production : 4,060.03 cu. yds./hour Adjusted fleet production : 13,479.28 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) Total job time : 0.90 hours <br />Unit cost : $0.082 per cu. yd. Total job cost : $987 <br />