Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : 063 State : Colorado Permit/job #: C-1981-010 <br />Date : 0710712009 County :Moffat Abbreviation :none <br />User : JDM Site : Trapper Mine Filename : C010-063 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action :Permit Revision 06 <br />Task description : Rip D Pit Haulroads (D1, D3, D4, D5, and Main) <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D10R - 10SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Horsepower : 570 <br />Shiftbasis : 1 per day <br />Data source : (CRG) <br />Utilization % <br />$95.00 NA <br />$138.49 100 <br />$8.66 100 <br />$32.78 NA <br />$274.92 Total fleet cost/hour : $1,099.69 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 28.10 acres Rip depth (ft) : 2.50 Volume : 113,337 BCY or CCY <br /> <br />Source of estimated quantity :Appendix A Table 1.4-5 <br />Source of estimated load factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity: NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 4,060.03 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.50 feet/pass Site altitude : 6,400 feet <br />Average ripping width : 8.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 500.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feettminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 1.007 acres/hour Adjusted unit production : 3,369.82 cu. yds./hour <br />Unadjusted production : 4,060.03 cu. yds./hour Adjusted fleet production : 13,479.28 cu. yds./hour <br /> <br /> <br />JOB TIME AND COST ... .... ...... <br />Fleet size : 4 dozer(s) Total job time : 8.41 hours <br />Unit cost : $0.082 per cu. yd. Total job cost : $9,246 <br />