My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-28_REVISION - C1981010 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2009-08-28_REVISION - C1981010 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:07 PM
Creation date
9/22/2009 2:10:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
8/28/2009
Doc Name
Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
PR6
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 08-Jul-2009 Permit or job no. C-1981-010 Site : Trapper Mine <br />User: JDM Abbreviation : none State :Colorado <br />Task : OOD Filename : C010-00D County:Moffat <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or job action :Permit Revison 06 <br />Task description : Summary of Topsoil Replacement, Revegetation, and Micellaneous Tasks <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />090 -Replace Topsoil on ASh Dump Pit Area scraperl 8 211.81 $680,231 <br />091 -Replace Topsoil on DIE Pit Area scraperl 8 250.1 $803,376 <br />092 -Replace Topsoil on Z Pit Area scraperl 8 126.01 $404,684 <br />093 -Replace Topsoil on F Pit Area scraperl 8 65.6 $210,741 <br />094 -Replace Topsoil on G Pit Area including K Pit scraperl 8 607.8 $1,952,156 <br />095 -Replace Topsoil on East A Pit Area scraperl 8 110.91 $356,192 <br />096 -Replace Topsoil at West Panel Ponds, BC Roads and Shop scraperl 8 160.2 $514,639 <br />097 -Replace Topsoil at East Panel Ponds and A Road scraperl 8 280.7 $901,523 <br /> <br />100 -Seed DIE Pit Range A-B revege 1 273.3 $176,587 <br />101 -Seed F Pit Range A-B revege 1 55.8 $36,054 <br />102 -Seed Z Pit Range A-B revege 1 190.261 $122,894 <br />103 -Seed G Pit Range A-B revege 1 600.5 $343,635 <br />104 -Seed Ash Dump Range A- revege 1 223.9 $144,668 <br />105 -Seed East A Pit Range A-B revege 1 130.3 $84,191 <br />106 -Seed A Pit Range C-B revege 1 268.3 $153,534 <br />107 -Seed H Pit revege 1 207.1 $58,547 <br />108 -Seed Ash Dump Range B revege 1 25.0 $7,067 <br />109 -Seed DIE Pits Range B revege 1 29.6 $8,368 <br /> <br />120 -Seal 16 Boreholes (MR212) borehole 1 64.0 $15,412 <br />121 -Seal 75 Developmental Drill Holes borehole 1 300.0 $72,260 <br />122 -Seal Monitoring Wells borehole 1 162.0 $36,799 <br />130 -Demolish Structures, Remove Materials and Debris demolish 1 160.0 $1,414,909 <br />131 -Mobilize and Demobilize Equipment mobilize 1 4.2 $22,604 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 4,507.6 $8,521,071
The URL can be used to link to this page
Your browser does not support the video tag.