My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-28_REVISION - C1981010 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2009-08-28_REVISION - C1981010 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:07 PM
Creation date
9/22/2009 2:10:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
8/28/2009
Doc Name
Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
PR6
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 046 State :Colorado Permit/job# :C-1981-010 <br />Date : 0710712009 County : Moffat Abbreviation : none <br />User : JDM Site : Trapper Mine Filename : C010-046 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Revision 06 <br />Task description : Regrade West Pyeatt Access Roads (1 and 2) <br />HOURLY EQUIPMENT COST _ <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 16,370 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Ownership cost/hour : $97.38 NA <br />Operating cost/hour : $138.49 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59 <br /> <br />Swell Loose <br />BCY factor : 1.250 volume : 20,462 LCY <br />Source of estimated volume :Appendix A Table 1.4-5 <br />Source of estimated swell factor :Operator Estimate <br />HOURLY PRODUCTION Job Condition <br />Average push distance : 80 feet <br />Unadjusted hourly production : 2,028.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 9.00 % (I <br />Average site altitude : 6,400 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description : <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Earth - Dry packed Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />ors Source <br />0.80 (user) <br />1.00 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1shift/day) <br />0.80 (fnd-rt) <br />0.81 (Cat HB) <br />1.00 (Cat HB) <br />0.90 (Cat HB) <br />1.00 (S/SU/U) <br />0.39 <br />787.23 LCY/hr <br />3,148.92 LCY/hr <br />6.50 Hours <br />Fleet size : 4 Dozer(s) Total job time : <br />Unit cost : $0.341 /LCY Total job cost <br />$6,983
The URL can be used to link to this page
Your browser does not support the video tag.