My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-28_REVISION - C1981010 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2009-08-28_REVISION - C1981010 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:07 PM
Creation date
9/22/2009 2:10:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
8/28/2009
Doc Name
Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
PR6
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />Date : 08-Jul-2009 Permit or job no. C-1981-010 Site : Trapper Mine <br />User : JDM Abbreviation : none State : Colorado <br />Task : 00B Filename : C010-008 County:Moffat <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or job action :Permit Revison 06 <br />Task description :Summary of Road Regrade Tasks <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />030 -Regrade BC Road dozer 4 35.7 $38,398 <br />031 -Regrade D-Pit Roads dozer 4 130.2 $139,996 <br />032 -Regrade West Ash Roads dozer 4 90.81 $97,586 <br />033 -Regrade LOM Roads (F2, F2-G5) dozer 4 139.3 $149,719 <br />034 -Regrade A Pit Roads (Middle A and North A) dozer 4 93.9 $100,955 <br />035 -Regrade F Pit Haul Roads (FO-1, FMain, F0, F1, F3, F4) dozer 4 78.8 $84,745 <br />036 -Regrade Middle VF2 Haul Roads dozer 4 33.0 $35,547 <br />037 -Regrade East Middle Z and Z3 Haul Roads dozer 4 33.8 $36,401 <br />038 -Regrade EF Haul Road dozer 4 7.9 $8,431 <br />039 -Regrade East A Haul Roads (East A and East A Split) dozer 4 43.4 $46,638 <br />040 -Regrade G5 Haul Road dozer 4 13.2 $14,219 <br />041 -Regrade K Pit Haul roads (KMain, K1, K2, K3) dozer 4 31.2 $33,557 <br />042 -Regrade Mine Access Road dozer 4 21.441 $23,044 <br />043 -Regrade Explosive Storage Access Road dozer 4 3.2 $3,491 <br />044 -Regrade No Name Access Roads (#2 and #4) dozer 4 6.5 $7,053 <br />045 -Regrade Potable Water Well Access Road dozer 4 1.6 $1,746 <br />046 -Regrade West Pyaett Access Roads (1 and 2) dozer 4 6.5 $6,983 <br />047 -Regrade Middle Pyeatt Access Roade (1, 2, 3) dozer 4 6.01 $6,459 <br />048 -Regrade East Pyaett Access Roads (1, 2, 3) dozer 4 7.9 $8,554 <br />049 -Regrade Grouse Access Road dozer 4 4.1 $4,469 <br />050 -Regrade West Flume Access Road dozer 4 2.4 $2,619 <br />051 -Regrade East Flume Access Road dozer 4 2.4 $Z619 <br />052 -Regrade Deal Access Roads dozer 4 10.2 $10,998 <br />053 -Regrade Horse Access Roads (Horse and Horse 1) dozer 4 7.9 $8,554 <br />054 -Regrade West Horse Access Road dozer 4 11.7 $12,570 <br />055 -Regrade Middle Flume Access Roads (1, 2, 3) dozer 4 6.2 $6,739 <br />056 -Regrade Oak Access Roads dozer 4 3.0 $3,317 <br />057 -Regrade Sage Access Roads dozer 4 4.0 $4,364 <br />058 -Regrade Johnson Access Road dozer 4 10.0 $10,824 <br />059 -Regrade Elk 1 Access Road dozer 4 2.4 $2,619 <br />060 -Regrade East Buzzard Access Road dozer 4 2.4 $2,619 <br />061 -Regrade Far East Buzzard Access Road dozer 4 2.4 $Z619 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 854.7 $918,452
The URL can be used to link to this page
Your browser does not support the video tag.