Laserfiche WebLink
MR214 1/17/2008 Mine identification Sign Update <br />Technical Revisions: <br />Revision No. Approval date Nature of revision <br />TR92 12/02/03 Permanent Retention of Sediment Control and Diversion <br /> Structures <br />TR93 5/17/2004 Annual Reclamation Report <br />TR94 9/29/2005 Retain Twenty-Five Ponds for use as Livestock and <br /> Wildlife Water Resources <br />TR95 6/28/2005 Annual Reclamation Report <br />TR96 2/15/2006 Response to Midterm No. 5 Review; Bond Liability <br /> Calculation and Mine Plan Update <br />TR97 9/28/2006 Annual Reclamation Report <br />TR98 2/08/2007 Update Topsoil Stripping and Mining Limits and Modify <br /> Road Locations in G and Z Pits. <br />TR99 3/27/2007 Monitoring and reporting Frequency for Investigation <br /> Boreholes in the G/K and Z Pit Areas <br />TR100 5/23/2007 Annual Reclamation Report <br />TR101 10/17/2007 Revise topsoil Stripping Areas in East A Pit and Z Pit, <br /> Revise Mining Limit in East A, F and Z Pits, Update <br /> Postmining Topography in F, Z, and Ash Pits <br />TR102 4/24/2008 Annual Reclamation Report <br />TR103 7/29/2008 Mining and Reclamation Plan Updates in A, K Ridge and Z <br /> Pits; Update to Deal and Horse Gulch Pond Information <br />TR104 6/15/2009 Annual Reclamation Report <br />TR105 8/28/2009 Topsoil Stripping Work in Horse Gulch Area <br />Bond Release <br />The Division approved a bond liability release (SL-01) on 2,511.7 acres of the Trapper permit <br />area on February 12, 1998. This was a Phase I release of liability for backfilling, grading, and <br />drainage reestablishment. It was Trapper's first bond release. A Phase II bond release (SL-02) <br />covering 1570.5 acres of the Phase I release was approved December 20, 1999. The Division <br />approved a Phase II bond release (SL-03) on 592.7 acres of cropland on April 19, 2002. SL-03 <br />was a release of reclamation liability and no monies were returned to the operator. <br />A Phase III Bond Release (SL-04) covering 1857.7 acres of areas reclaimed to rangeland and <br />cropland was approved on November 18, 2003. The Division approved a Phase I bond release <br />(SL-05) for 823.9 acres on June 11, 2004. The Division approved a Phase II bond release (SL- <br />06) for 819.1 acres of area reclaimed to rangeland on October 25, 2005. On July 3, 2006, the <br />Division approved a Phase III bond release (SL-07) covering 185.5 acres of areas reclaimed to <br />cropland and 577.3 acres of areas reclaimed to rangeland. A Phase I bond release (SL-08) was <br />approved by the Division on January 6, 2009 covering 476.6 acres. The Division approved a <br />Phase 11 bond release (SL-09) covering 294.6 acres on January 9, 2009. A Phase III bond release <br />(SL-10) covering 305 acres was approved by the Division on December 29, 2008. <br />Trapper Mine 9 September 21, 2009