My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2009-09-21_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:41 PM
Creation date
9/22/2009 2:03:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
9/21/2009
Doc Name
Proposed Decision and Findings
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
PR6
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. Hydrologic Balance - Rule 4.05 <br />Volume 4 of the Trapper Mine permit application includes an assessment of the <br />probable hydrologic consequences of the proposed mining operation. Each year <br />Trapper assesses the ongoing impacts to the hydrologic system in its annual hydrologic <br />report submitted as Appendix W of the permit application. The probable hydrologic <br />consequences as set forth in Volume 4 and Appendix W are summarized below. <br />A. Water Quality Standards and Effluent Limitations <br />Surface discharge at the Trapper Mine is monitored under CDPS permit # CO- <br />0032115 issued by the Colorado Department of Public Health and Environment. <br />In addition, the applicant has quarterly reporting requirements imposed by the <br />Division as part of its surface water monitoring program. Acute toxicity testing <br />through bio-monitoring sampling is required in No Name, East Buzzard, Coyote, <br />West Buzzard, Middle Pyeatt, and East Pyeatt drainages due to pit dewatering. No <br />specific approvals are required by the Division under this section. <br />B. Stream Channel Diversions <br />Drainage way reconstruction is discussed under Section 4.8.1.3, Vol. IV of the <br />permit application. <br />1. Channel lining structures, retention basins, and artificial channel roughness <br />structures are proposed for use to control erosion. These means are proposed <br />to be approved by the Division being that they are necessary to control <br />erosion; they are stable and will require infrequent maintenance. The <br />applicant uses rock check structures, various geotextiles, and rapid growing <br />vegetation within reconstructed drainages to control erosion. (4.05.4(2)(a)). <br />C. Sedimentation Ponds <br />Sediment ponds are discussed under Section 4.8.1.4, Vol. IV of the permit <br />application. <br />The applicant uses sedimentation ponds in all disturbed drainages to control the <br />increased sediment loads within the ephemeral drainages on the mine site. All <br />sediment ponds are designed to contain or treat the 10-year, 24-hour event and <br />safely pass the 25-year, 24-hour event, at a minimum. One MSHA size pond <br />exists on the site in the Coyote drainage. <br />Technical Revision TR-103 approved the resizing of Horse Gulch Pond to address <br />the activities proposed in PR-06. TR-103 was approved on July 29, 2008. <br />D. Surface and Ground Water Monitoring <br />Trapper Mine 24 September 21, 2009
The URL can be used to link to this page
Your browser does not support the video tag.