Laserfiche WebLink
CIRCES Cost Estimating Software <br />UIPMENT MOBILIZATION / DEMOBIL12 <br />PROJECT IDENTIFICATION <br />Agency or organization name <br />Task #: 005 State <br />Date : 0911612009 <br />User : JLE <br />sheet 1 of 2 <br />Permit or other job action :Amendment 01 <br />Task description : Mobilization/demobilization of equipment <br />EQUIPMENT TRANSPORT RIG COST Shift basis : p y <br />Truck tractor description <br />Truck trailer description <br />Colorado Division Of Reclamation, Mining And Safety <br />Colorado Permit/job # :M-2000-115 <br />County : Las Animas Abbreviation :none <br />Site : Mulletts Excavating Pit #1 Filename : M115-005 <br />Cost data source : CRG Data <br />Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Generic folding goosenecl <br />Available rig capacities <br />Ownership cost/hour <br />Operating cost/hour <br />Operator cost/hour <br />Helper cost/hour <br />Total Unit Cost/hour <br />Cost Breakdown : <br />NnN_RnADARLF FOLIIPMFNT <br />drop deck equipment trailer (25T, 50T, and 100T) <br />0-25 Tons 26-50 Tons 51+ Tons <br />$16.63 $18.37 $22.33 <br />$44.38 $46.13 $50.07 <br />$27.66 $27.66 $27.66 <br />$0.00 $25.39 $25.39 <br />$88.67 $117.55 $125.45 <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D9R - 9SU (2005) 66.73 $58.86 $125.45 2 $368.62 $250.90 $500.00 <br />-CAT 962G (2003) 20.41 $20.30 $88.67 2 $217.93 $177.34 $500.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $586.56 $428.24 $1,000.00