My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_APPLICATION CORRESPONDENCE - C2009087
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2009087
>
2009-09-21_APPLICATION CORRESPONDENCE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:37 PM
Creation date
9/21/2009 11:45:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
9/21/2009
Doc Name
Request for Extension of Preliminary Adequacy Review
From
Peabody Energy
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peab <br />4 <br />Peabody Energy <br />701 Market Street <br />St. Louis, Missouri 63101-1826 <br />314-342-3400 <br />Colorado Coal Resources, LLC <br />September 15, 2009 <br />Mr. Tom Kaldenbach <br />Environmental Protection Specialist <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />REGENE <br />SEP 212009 <br />Li„ -. ut n,;ciarnatioi. <br />Mining and Safety <br />Re: Peabody Sage Creek Mine (C-2009-087) Request for Extension of the Preliminary <br />Adequacy Review <br />Comment Period <br />Dear Mr. Kaldenbach: <br />Sage Creek Coal Company (SCCC) has reviewed the Preliminary Adequacy Review for the <br />Peabody Sage Creek Mine (PSCM) Permit Application issued by the Division on August 28, <br />2009. SCCC has determined that the level of effort and time necessary to complete a thorough <br />response to adequacy comments and incorporate major revisions to the permit application <br />package (PAP) will be significant. These include a change in the mine and operations plan and a <br />revision to the portal and mine facilities area. Additional hydrology information and analysis <br />will be incorporated into the PAP as will updated baseline information for vegetation. Further, <br />most of the maps in the PAP will also need to be revised and rerun. <br />In order to produce a complete and adequate response package that incorporates the many <br />changes or updates to the PAP and provide CDRMS sufficient review time, SCCC requests that <br />the deadline for issuing a proposed decision for the PSCM be extended to January 15, 2010. <br />If you have any questions or need additional information regarding this request, pleas contact me <br />as soon as possible. <br />Sincerely, <br />Vern Pfannenstiel <br />Manager Environmental Services - West <br />Peabody Investments Corporation <br />cc: Brian Dunfee (PEC) <br />Jerry Nettleton (TMCC)
The URL can be used to link to this page
Your browser does not support the video tag.