Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />----- <br />Agency or organization name: DRMS <br />Task # : 05a State : Colorado Permit/job # : M-2009-048 <br />Date : 0911412009 County :Mesa Abbreviation :none <br />User : THM Site :Gunnison River Gravel Pits Filename :M048-05a <br />Permit or other job action :Final Reclamation Cost Estimate __--- <br />Task description :Mobilization of equipment to and from site <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROAUABLt r_WU1rmr_1 V a <br />it <br />OT <br />Machine <br />Description Weight/ unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet <br />56 Return Trip <br />Cost/hr/fleet <br />$117 <br />55 perm <br />D <br />Cost/fleet <br />00 <br />$250 <br />-Cat D7R DS Series 11- 7SU <br />etation Tractor <br />-Reve 31.25 <br />10.00 $41.01 <br />$25.00 $117.55 <br />$88.67 1 <br />1 $158. <br />$113.67 . <br />$88.67 _ <br />$250.00 <br />g <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 22 <br />$206 00 <br />$500 <br /> Subtotals : $272.23 . .