Laserfiche WebLink
q //-oq <br />14 -11 !'l - m -v <br />t -rot" ,DIVISION OF RECLAMATION, MINING AND SAFETY <br />CEASE AND DESIST ORDER G,-? <br />Operator/Company Name: <br />-t&", Wildcat Mining Corp. <br />Mike Clements <br />3643 Baker St. <br />San Diego, CA 92117 <br />Phone: (858) 483-4808 <br />Location: <br />May Day/Idaho Mill Access Road <br />Sec. 28, T36N, RI I W (10th P.M.) <br />La Plata County <br />'Fer:® <br />SEP 17 2009 <br />Divisian of Reclans 1o, <br />Mining and Safety <br />(Distance and direction from nearest city) 4.3 miles north of Hesperus CO <br />(Operation Type) 110(2) (Commodity Mined) Silver & Gold <br />The Division of Reclamation, Mining and Safety ("the Division") has conducted an inspection of the above- <br />referenced operation and has determined that you are or appear to be: <br />X conducting a mining operation without a permit in violation of C.R.S. 34-32-109(1), or C.R.S. <br />34-32.5-109(1) <br />conducting prospecting or exploration without having filed a notice of intent to conduct <br />prospecting or exploration operations as required by C.R.S. 34-32-113(1), or C.R.S. 34-32.5- <br />113(1) <br />Whenever an operator fails to obtain a valid permit or file a Notice of Intent to Conduct Prospecting or <br />Exploration, the Board or Division may issue an immediate cease and desist order (C.R.S 34-32-123 and 34- <br />32.5-123). Concurrently with the issuance of such an order, the Board or Division may seek a restraining order <br />or injunction (C.R.S 34-32-123 and 34-32.5-123). <br />Sections 34-32-123(2) and (3), C.R.S. (Colorado Mined Land Reclamation Act) and 34-32.5-123(2) and (3), <br />C.R.S (Colorado Land Reclamation Act for the Extraction of Construction Materials) also provide for <br />imposition of civil penalties. Both statutes provide a civil penalty of $1,000 to $5,000 per day for mining <br />without a permit and $50 to $200 per day for prospecting or exploration without having filed a notice to conduct <br />such activity and for hard rock limited impact mining operations without a permit that are regulated under <br />C.R.S. 34-32-110 for each day the land has been affected for up to a maximum of 60 days. For unpermitted <br />construction material mining operations, the civil penalty may be imposed for each day the land has been <br />affected for up to a maximum of 365 days (C.R.S. 34-32.5-123(2)). <br />Under the authority vested in the Division by C.R.S. 34-32-123(1) and C.R.S. 34-32.5-123(1), you are hereby <br />ordered to immediately cease and desist all mining, prospecting, and exploration activities other than those <br />required to prevent damage to off-site areas or protect the public health and safety. <br />The Division will send a report of its inspection within 10 days. You will also receive a 30-day advance notice, <br />by Certified Mail, of a hearing to be held before the Mined Land Reclamation Board to consider the above <br />described possible violation. <br />Company/Operator Representative: <br />(Signature of Person Served) <br />(Please print name)