1 12 APPLICATION PAGE 25 OF 35 <br />• 6.4.11 EXHIBIT L - Reclamation Costs <br />is <br />Reclamation of the project site will consist lining the new ponds with gravel and seeding <br />the affected land not within the ponds areas as well as removing the gravel haul roads. If <br />importing fill material is required to reclaim the site, the fill material will consists of non- <br />hazardous soil, concrete, rock, and brick such that no single piece of material has a <br />dimension larger than two (2) feet on any face. No material larger than six (6) inches in <br />diameter will be placed within the top two feet of the final grade. <br />The reclamation cost estimate assumes that a majority of the reclamation work required is <br />located the farthest point away from the material stockpile locations. The estimate <br />assumes the following: <br />30.25 acres to be backfilled/compacted; <br />5.97 total acres requires topsoil replacement; <br />5.97 acres will be deep tilled prior to topsoil placement; <br />5.97 acres to be disked, mulched, seeded and fertilized; <br />Scale house to be demolished; <br />Two settlement ponds at 1 acre each are to be demolished; <br />Two gravel lined ponds will be created totaling 24.3 acres <br /># DESCRIPTION QUAN UNIT $/UNIT TOTAL <br />1 Recom act Site 29,000 SY $ 0.50 $ 14,500 <br />2 Gravel Line Ponds 6" THICK 20,000 CY $ 5.00 $ 100,000 <br />3 Demolish Settlement Ponds 2 times 1 Acre 10,000 SY $ 0.50 $ 5,000 <br />4 Scale Structure 1 LS $ 2,500.00 $ 2,500 <br />5 To soil Placement From Stockpile 4,800 CY $ 0.87 $ 4,176 <br />6 Mulch, Seed, and Fertilize 4,800 CY $ 10.00 $ 48,000 <br />TOTAL $ 174,176 <br />0