My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-17_REVISION - C1981018 (2)
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2008-06-17_REVISION - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:33:10 PM
Creation date
9/17/2009 2:58:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
6/17/2008
Doc Name
Public Notice
From
DRMS
To
Rio Blanco HeraldTimes
Type & Sequence
TR65
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />NOTICE OF PROPOSED DECISION <br />The Colorado Division of Reclamation, Mining and Safety proposes to Approve Technical Revision <br />Application No. 65 (TR-65) for the Deserado Mine (Permit No. C-1981-018), submitted by Blue <br />Mountain Energy, Inc. This revision responds to questions raised by the Division as a result of the <br />midterm review of the permit. <br />The Deserado Mine is an underground coal mine located in Rio Blanco County, approximately 7 miles <br />northeast of Rangely, Colorado. Coal interest is Federal, and the surface affected is Federal and private <br />land. The permit area encompasses approximately 11,028.71 acres. <br />This proposed decision is based on a fmding that the proposed operation will comply with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, Section 34-33-101, et seq., C.R.S., <br />and the regulations promulgated thereunder. <br />Copies of the proposed decision, including stipulations, are on file for public inspection at the Colorado <br />Division of Reclamation, Mining and Safety, Room 215, Centennial Building, 1313 Sherman Street, <br />Denver, Colorado 80203. Persons with an interest that may be adversely affected by the proposed <br />decision may request a formal hearing before the Mined Land Reclamation Board on the proposed <br />decision. Such request must be made within ten (10) days of the initial publication of this notice, must be <br />in writing, and must state with reasonable specificity the reasons for the request and the objections to the <br />proposed decision.
The URL can be used to link to this page
Your browser does not support the video tag.