My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-01_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2008-05-01_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:29:01 PM
Creation date
9/17/2009 1:30:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
5/1/2008
Doc Name
Corrected Hydrology Review (E-mail)
From
Tom Kaldenbach
To
Jason Musick
Type & Sequence
PR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />Musick, Jason <br />From: Kaldenbach, Tom <br />Sent: Thursday, May 01, 2008 10:04 AM <br />To: Musick, Jason <br />Subject: Corrected Deserado PR-6 Hydrology Review <br />Jason, <br />Below I have corrected my email from two days ago to say White River, rather than Yampa River where the CHIA <br />is mentioned. <br />I have completed my review of the PR-6 application for compliance with the hydrology rules. <br />No new impacts to surface water can be expected from the mining proposed in PR-6 because the application <br />proposes no new surface disturbance, no new mine pumping, and no new subsidence of surface water features. <br />No new impacts to ground water can be expected from the mining proposed in PR-6 because the application <br />proposes continuing the downdip expansion of mine workings toward the axis of the Red Wash Syncline. If gob <br />leachate were to migrate from these new panels, the migration pathway would be the same as from previously <br />mined panels. Existing ground water monitoring wells are properly located for intercepting the leachate and for <br />assessing compliance with State and Federal ground water standards. <br />The absence of new hydrologic impacts from mining proposed in PR-6, indicates a revision of the White River <br />Cumulative Hydrologic Impact Assessment is unnecessary. <br />The application indicates continued compliance with all hydrology rules; therefore, I have no adequacy questions <br />for the mine operator. The PR-6 application supports findings that adverse impacts to the hydrologic balance <br />within the permit boundary will be minimum amount that can be expected from a longwall mine and that material <br />damage to the hydrologic balance outside the permit boundary will be prevented. <br />Tom Kaldenbach <br />5/1/2008
The URL can be used to link to this page
Your browser does not support the video tag.