My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-24_REVISION - C1981018 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2008-03-24_REVISION - C1981018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:01 PM
Creation date
9/17/2009 1:28:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
3/24/2008
Doc Name
Reclamation Cost Summary
From
DRMS
To
File
Type & Sequence
TR66
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : TR-66 <br />Task description :Regrade degas well drillpads LWB10-1 through 4 <br />HOURLY :::: :.;:.;:.;:................................................................................................................................................................................. <br />................ <br />EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />volume : 1,129 CCY factor : 1.215 <br />volume : 1,372 LCY <br />Source of estimated volume :13.7 acres X 1-foot thick <br />Source of estimated swell factor :DRMS estimate <br />................. <br />. <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Top Soil <br />0.00 % () <br />5,800 feet <br />1,600 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.72 <br />Adjusted unit production <br />Adjusted fleet production <br />889.65 <br />3,558.62 <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/da) <br />(fnd-rt) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S/SU/U) <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 0.39 Hours <br />Unit cost : $0.233 /LCY Total job cost : $320
The URL can be used to link to this page
Your browser does not support the video tag.