Laserfiche WebLink
Response: In review of the settlement conference notes for Notice Of Violation <br />CV-2008-004, all 5 of the abatement measures will be completed upon approval of <br />this technical revision. Any discussions about a longer term plan for the East Pit <br />area, including but not limited to the installation of permanent sediment control <br />structures, was a good faith effort on the part of Colowyo to assure the Division <br />that the issue would be discussed at a later date during Colowyo's next PMT <br />revision. This revision will not occur by 31 December 2009. <br />Should you have any questions or require additional information, please feel free to contact <br />me at (970) 824-1529. <br />Sincerely, <br />nnifer Sekuls i-Barton <br />Environmental Engineer <br />Encl. 2 copies <br />Cc: file CF 1.1.2.67