Laserfiche WebLink
STIPULATION 8 <br />NO LATER THAN 15 MARCH 2008 THE COLOWYO COAL COMPANY SHALL <br />SUBMIT A TECHNICAL REVISION TO THE DIVISION CONTAINING A <br />COMPREHENSIVE RECLAMATION PLAN FOR THE EAST PIT, WEST PIT, SECTION 16 <br />PIT, SOUTH TAYLOR PIT, FACILITIES AREA, GOSSARD LOADOUT AND ALL <br />REMAINING DISTURBANCES AT THE COLOWYO MINE. THE REVISION WILL <br />ELIMINATE OUTDATED METHODS OF RECLAMATION THAT ARE CURRENTLY <br />USED AT THE COLOWYO MINE. FURTHER, THE REVISION WILL ADDRESS <br />DIVISION CONCERNS REGARDING REVEGETATION, SOILS HANDLING AND <br />SPECIES DIVERSITY SUCCESS STANDARDS, ETC. TO MEET THE CURRENT POST- <br />MINING LAND-USE. CONSULTATION WITH THE DIVISION, THE COLORADO <br />DIVISION OF WILD*TLIFE, THE BUREAU OF LAND MANAGEMENT AND OTHER <br />APPROPRIATE AG El_` CIES YZ?ILL BE 1``IErEcJ cJARY <br />Stipulation 8 was complied with on 14 March 2008 with the submittal of Technical Revision 72. <br />TR-72 was received on 14 March 2008, deemed complete on 21 March 2008 and is still under <br />consideration by the Division. While the submittal of Technical Revision 72 satisfied this <br />stipulation, and the Division has proposed a decision to approve the revision, portions of the <br />reclamation plan remain outstanding/deficient. The Division has added stipulations 12 and 13 to <br />the Colowyo permit to address these outstanding issues with the reclamation plan. <br />STIPULATION 9 <br />PRIOR TO CONDUCTING ANY HIGHWALL MINING IN THE SOUTH TAYLOR PIT THE <br />COLOWYO COAL COMPANY SHALL SUBMIT A TECHNICAL REVISION TO THE <br />DIVISION INCLUDING A MINING PLAN AND SEQUENCE, A STABILITY ANALYSIS <br />AND A ZERO SUBSIDENCE ANALYSIS AND PLAN. HIGHWALL MINING MAY NOT <br />BEGIN IN THE SOUTH TAYLOR PIT UNTIL THE AFOREMENTIONED REVISION HAS <br />BEEN APPROVED BY THE DIVISION. <br />Stipulation 9 was complied with on 9 December 2008 with the submittal of Technical Revision <br />77. TR-77 was received on 9 December 2008, originally deemed incomplete on 19 December <br />2008, deemed complete on 30 January 2009 and approved on 30 March 2009. <br />STIPULATION 11 <br />THE COLOWYO MINE WILL SUBMIT CERTIFIED COPIES OF ALL MINE MAPS, NOT <br />INCLUDED IN THE TECHNICAL REVISION 67 SUBMITTAL (MAPS 1, 2, 19, 19A, 23 <br />AND 23A WERE INCLUDED WITH TR-67), WITH THE MINE'S NEW PERMIT <br />BOUNDARY NO LATER THAN 1 FEBRUARY 2008. <br />Stipulation 11 was complied with on 6 November 2007 with the submittal of Minor Revision 90. <br />MR-90 was received on 6 November 2007, deemed complete on 16 November 2007 and <br />Proposed Decision and Findings of Compliance 14 September 2009 <br />Permit Renewal 05 Page 11