Laserfiche WebLink
<br /> <br />A lot of the north side was and is being sloped and being <br />readied for planting when the final grading is completed. The <br />remaining one to two acres will be opened up and mined in the <br />northwest corner of the pit in the next year. The small area in <br />the southeast corner will be completed and sloped gradually as <br />the currant sand pile is sold or moved. The bottom of the pit <br />area will begin to be sloped with the proper drainage within <br />the next year. Most of the area will be mined to some degree <br />within the next year and sloping on the sides continuing until <br />- mining-is-complete.-