Laserfiche WebLink
-4- <br />12. Primary future (Post-mining) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />2 Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />-0 13. <br /> <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Pit Run will be excavated with tracked dozers and rubber-tired loaders; and pushed to a stockpile area to feed crusher. <br />15. On Site Processing: Crushing/Screenmg <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The proposed pit would expand the existing pit by 8.692 Acres resulting in a new pit area of <br />18.532 Acres.