My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-11_REVISION - M1997064 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997064
>
2009-09-11_REVISION - M1997064 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:50 PM
Creation date
9/14/2009 10:56:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997064
IBM Index Class Name
REVISION
Doc Date
9/11/2009
Doc Name
Conversion Submittal
From
EAI
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Cost Estimate <br />Per 10-Acre Area <br />Direct Tasks Unit Quantity Cost Total Cost <br />Grading floor <br />Grader hour 8 $ 188.00 $ 1,504.00 <br />Reconstructing approx 100 feet 3H: 1V slopes on 15 ft highwall <br /> with 50 ftbenches eve 10 vertical feet <br />Fill material c 1,020 <br />Loader/truck c /da 4400 $1,954.20 $ 453.02 <br />Dozer c /da 2300 $1,539.20 $ 682.60 <br /> Subtotal $ 1,135.62 <br />Placing surface <br />material <br />Loader hours 8 $ 188.00 $ 1,504.00 <br />Dump truck hours 8 $ 188.00 $ 1,504.00 <br />Dozer hours 8 $ 188.00 $ 1,504.00 <br /> Subtotal $ 4,512.00 <br />Seeding <br />Drill acres 10 $ 75.00 $ 750.00 <br />Seed mix acre 10 $ 135.00 $ 1,350.00 <br />Mulch acre 10 $ 55.00 $ 550.00 <br /> Subtotal $ 2,650.00 <br />Tracking seed and <br />mulch <br />Dozer hours 6 $ 188.00 $ 1,128.00 <br />Mobilization fee hours 2 $ 100.00 $ 200.00 <br /> Direct Expenses <br /> Total $11,129.62 <br />Indirect Tasks <br />Liability insura nce 0.0155 $ 172.51 <br />Performance bond 0.015 $ 166.94 <br />Profit 0.1 $ 1,112.96 <br />Job Superinte ndent 20 $ 88.00 $ 1,760.00 <br /> Subtotal $ 3,212.42 <br />Miscellaneous indirect 0.0925 $ 1,326.64 <br /> Total Bond $15,668.67 <br />Assumptions <br />1. Reclamation will occur in a maximum of 10 acre phases <br />2. Process area will move onto pit floor in Phase 2 <br />Page 20 of 34
The URL can be used to link to this page
Your browser does not support the video tag.