My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-10_PERMIT FILE - M2009074
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009074
>
2009-09-10_PERMIT FILE - M2009074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:21 PM
Creation date
9/11/2009 1:50:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009074
IBM Index Class Name
PERMIT FILE
Doc Date
9/10/2009
Doc Name
New 110c Appl.
From
Environment, Inc. for Colorado Backhole Service
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST ESTIMATE <br />The following Reclamation Cost estimate is based on the <br />assumption that there will be no more than 8.57 acres ± <br />disturbance at any one time. The mine working face will be 400 <br />feet long, average 10 feet high. When it comes time to resoil <br />the area, an average of 10 inches of soil would be spread over <br />the disturbed area. At that time we will have to respread 6,937 <br />cubic yards of topsoil and move 1,748 cy of cut\fill sloping. No <br />sloping will be necessary on the exterior slopes as they will be <br />done as mining progresses. The table below outlines the various <br />areas of disturbance at the time explained above. A D8T is used <br />to do the shaping and resoiling in this calculation and the <br />mobilization haul distance is 7 miles from Pueblo. The <br />revegetation cost figure used includes fertilizer, grass seed, <br />mulch, labor and drilling costs. <br /> STAGE TOTAL SOIL DEPTH <br /> NEEDING RESOILING 5.26 10" <br /> REVEGETATION AREA 6.57 <br /> RESOIL @ 1 0° 6,937 CUBIC YARDS <br /> CUT/FILL SLOPING 1 ,74B CUBIC YARDS <br /> ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br /> Unit Cost <br />1. Revegetation areas includes grass seed, fertilizer <br /> and labor to drill. . . . . . . . . . . . . . . $ 500.00/AC. <br />2. Re-spreading soil and/or growth media with <br /> D-8 cat push distance 200 ft or less. $ 0 . 404/YD3 1/ <br />3. Cut/fill working face 400 feet long by 20 feet high <br /> D-8 cat push distance 150 ft or less. . . . . . . . . . . $ 0.379/YD''/ <br /> RECLAMATION COSTS <br />1. Revegetation, 8.57 ac @ $500.00/ac $4,285.00 <br />la. Secondary revegetation 8.57 ac @ 33% * $500.00/ac 1,414.05 <br />2. Resoiling, 6,937 yd3 * 1.12 swell = 7,234 @ 40.4?/yd3 3,124.27 <br />3. Cut/fill sloping 1692 yd3 * 1.10 swell=1922@37.9G/yd3 728.13 <br /> Net Total $9,551.45 <br />5. Indirect costs <br /> Mobilization 804.07 <br /> Insurance, Bond, & Profit 1,196.32 <br />6. Administration costs 955.15 <br /> TOTAL ESTIMATE $12,506.99 <br />Recommend bond be set at $12,500.00 <br />26
The URL can be used to link to this page
Your browser does not support the video tag.