Laserfiche WebLink
Roadside Portals C-1981-041 <br />Partial Phasa 111111 Rnnd RPlaasP Sl -05 <br />PROJECT IDENTIFICATION <br />Date: ;31-Au -09 Permit C-1981-041 Site: Roadside Portals <br />User: JRS State : Colorado <br /> Filename: C041-500 Count : Mesa <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Partial Phase II/I1I Bond Release SL-05 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />505 Backfill and Regrade Approximately 5% of Rail Spur Area 0.25 $171 <br />502 Replace Topsoil from Stockpile to Approximately 41 % of Overland Conveyor Area 2.06 $1,608 <br />503 Replace Topsoil from Stockpile to Approximately 5% of Railroad Spur Area __ 0.12 <br />` _ $90 <br />530 Drill Seed Lowland Mix on SL-05 Release Areas 4.20 $2,798 <br />535 Demolish ad Remove SL-05 Structures 10.00 $3,317 <br /> <br /> Direct Cost Total T 16.63 $7,484 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (2.02% of Direct Costs) $161 <br /> Performance Bond (1.05% of Direct Costs) $84 <br /> Job Superintendent (at $39.38?9iour) 8.32 $327 <br /> _ <br />Profit (10.00% of Direct Costs) $798 <br /> <br /> <br /> Total Overhead and Profit $1,371 <br /> <br /> Contract Amount Direct Costs + Overhead and Profit) $9,355 <br /> <br /> <br /> L ma - En ineerin - Pro'ect Mana ement <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $398 <br /> Reclamation Management and Administration (4.5% of Contract) $421 <br /> <br /> <br /> <br /> TOTAL BOND AMOUNT $10,174 <br />jrs Page 1 31.08.09