My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-09_GENERAL DOCUMENTS - C1981041
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981041
>
2009-09-09_GENERAL DOCUMENTS - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:18 PM
Creation date
9/10/2009 2:40:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/9/2009
Doc Name
Proposed Decision & Findings of Compliance for SL5
From
Phase I/II/III on 2.1 acres of Overland Converyor Corridor
Permit Index Doc Type
Findings
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roadside Portals C- 1981 -041 <br />Partial Phasa 111111 Rnnd RPlaasP Sl -05 <br />PROJECT IDENTIFICATION <br />Date: ;31 -Au -09 <br />Permit <br />C- 1981 -041 <br />Site: Roadside Portals <br />User: <br />JJRS <br />State: Colorado <br />Filename: <br />C041 -500 <br />County: Mesa <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Partial Phase II/I1I Bond Release SL -05 <br />Task Description <br />Task <br />TASK HOURS <br />DIRECT COST <br />505 <br />Backfill and Regrade Approximately 5% of Rail Spur Area <br />0.25 <br />$171 <br />502 <br />Replace Topsoil from Stockpile to Approximately 41 % of Overland Conveyor Area <br />2.06 <br />$1,608 <br />503 <br />Replace Topsoil from Stockpile to Approximately 5% of Railroad Spur Area_ <br />0.12 <br />`4.20 <br />$90 <br />530 <br />Drill Seed Lowland Mix on SL-05 Release Areas <br />_ <br />$2,798 <br />535 <br />Demolish ad Remove SL -05 Structures <br />10.00 <br />$3,317 <br />Direct Cost Total T <br />16.63 <br />$7,484 <br />INDIRECT COSTS <br />Overhead and Profit <br />Liability Insurance (2.02% of Direct Costs) <br />$161 <br />Performance Bond (1.05% of Direct Costs) <br />$84 <br />Job Superintendent (at $39.38�9iour) <br />8.32 <br />$327 <br />_ <br />Profit (10.00% of Direct Costs) _ _ _ <br />u <br />$798 <br />_ _ <br />Total Overhead and Profit <br />$1,371 <br />Contract Amount Direct Costs + Overhead and Profit) <br />$9,355 <br />L ma - Engineering - Project Mana ement <br />Engineering Work and Contract/Bid Preparation (4.255 %0 of Contract) <br />_ <br />$398 <br />Reclamation Management and Administration (4.5% of Contract) <br />$421 <br />TOTAL BOND AMOUNT <br />$10,174 <br />jrs Page 1 31.08.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.