Laserfiche WebLink
5 (Form 2- Public) <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />4. Describe how drill holes will be plugged (refer to Rule 5A of the Rules for required abandonment procedures): <br />None <br />Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />(one) Adi.ts which was hprp mi me ±he EA I w 1900 <br />Aditd is steel open:and steel Prospecting in Aditd <br />a in the 160-0 sq. fd. that I didn't need a <br />Notice of intent to conduct i2 <br />for Hard Rock/Me al min a T (Terry win*ig- Was call <br />Mined Ladd Reclamation Roa rcl ' DRM.-, a Noti-e of a4i °nt <br />found that I (Terry Winters) is in the 16000 sq. ft-and tons. rule. <br />Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: