My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-09_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2009-09-09_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:19 PM
Creation date
9/10/2009 9:04:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
9/9/2009
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Seneca Coal Company
Type & Sequence
TR50
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />September 9, 2009 <br />Roy Karo <br />Seneca Coal Company, LLC <br />37796 Routt County Road 53 <br />P.O. Box 670 <br />Hayden, CO 81639 <br />Re: Seneca II Mine (Permit No. C-1980-005) <br />Proposed Decision - Technical Revision No. 50 (TR-50) <br />Termination of Revegetation Monitoring <br />Dear Mr. Karo: <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Enclosed you will fmd the Division of Reclamation, Mining and Safety's Proposed Decision for Technical Revision No. 50 at <br />the Seneca II Mine. Notice of the proposed decision will be published in the Steamboat Pilot as soon as possible. The first <br />publication will initiate the ten (10) day public comment period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision application was sent to the <br />Office of Surface Mining and the Bureau of Land Management. The material should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond Held equals or <br />exceeds the Revised Liability, you need not submit additional bond. However, if the Revised Liability exceeds the Bond Held, <br />please submit additional bond or rider to your existing bond that equals or exceeds the Revised Liability. This Technical <br />Revision must not be implemented until this proposed decision becomes final and until any required increase in bond is <br />submitted to and approved by the Division. <br />If you have any questions, please contact me. <br />Since ely, <br />aniel T. Mathews <br />Environmental Protection Specialist <br />Enclosure <br />cc: Carl Johnston, Office of Surface Mining, with enclosures <br />C-TR-06 C1980005 DTM 09092009024126.doc <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.