My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-02_REVISION - M1998022 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998022
>
2009-09-02_REVISION - M1998022 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:49 PM
Creation date
9/9/2009 3:33:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998022
IBM Index Class Name
REVISION
Doc Date
9/2/2009
Doc Name
Conversion application
From
The Gallegos Corporation
To
DRMS
Type & Sequence
CN1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
commitment of resources because rock is not a renewable product. After all desired materials <br />have been handpicked and transported off site, it is estimated that at least five feet of rock will <br />remain on the talus slope. <br />Intensity <br />1) Both beneficial and adverse effects have been considered in my decision. Over the long-term, <br />the existing steep hillside will be gradually reclaimed to a more stable slope, lowering the risk of <br />exposure to life and property that is present under current conditions. <br />Approximately 50 homes are located within visual and auditory range of the project area. Sounds <br />from heavy equipment being used on the hill would be heard on an intermittent basis (2-3 days a <br />week) for up to one-third of the year. Removing surface rocks would also result in a long-term <br />color contrast in the talus slope. These impacts are why I decided to add hours of operation and <br />rock staining requirements. Hours of operation will help preserve quiet hours in the evenings and <br />weekends valued by full and part-time residents. Staining will help blend freshly exposed rock <br />surfaces with the surrounding darker rock within a couple weeks of application. Some wildlife is <br />likely to leave the area to avoid noise and disturbance; however, they are expected to return after <br />the harvesting concludes each year. These impacts are considered short-term in nature and will <br />not impair long-term productivity and as thus, they are not considered to be of significant <br />intensity. <br />2) The limited amount of truck traffic associated with this activity will not exceed traffic levels <br />from the past 10 years and will pose no more threat to residents than existing visitor and <br />residential traffic currently does on a daily basis. Incidental dust may be generated from rocks and <br />equipment moving around on the talus slope located on NFS lands and our design criteria <br />includes watering to minimize dust as needed. More potential for dust originates on private land <br />where bare soil is exposed (staging area and private access road) which is outside the control of <br />the Forest Service. We recommend Gunnison County consider this impact and appropriate dust <br />abatement procedures when evaluating the land use application from the Gallegos Corporation. <br />Rock harvesting is not anticipated to cause disproportionate adverse human health or <br />environmental effects to air quality. <br />3) The project area can be seen from a 0.5 mile stretch of the Crystal River, of which 20 miles is <br />considered eligible for wild and scenic rivers status as a recreation river. Scenery is one of the <br />outstandingly remarkable values (ORV) identified for this segment of river. Rock staining will <br />preserve scenic quality in the river view corridor and result in no long-term impact to the scenery <br />ORV or effect to the eligibility, potential classification, or potential suitability of the area. <br />Noise and incidental dust generated by the operation would not be detectable in the nearby <br />Maroon Bells-Snowmass or Raggeds Wilderness areas. The project does not require any road <br />access through the adjacent Gallo Hill roadless area. There will be no impacts on research natural <br />areas or designated parklands or prime farmlands since these do not exist within the affected area. <br />4) The effects on the quality of the human environment are not highly controversial, because <br />there is no substantial dispute as to the size, nature or effects of the proposed action among <br />scientists. <br />5) The environmental effects analysis (EA, Chapter 3) demonstrates that the effects are not <br />uncertain and do not involve unique or unknown risk. <br />6) This site-specific action does not establish a precedent for future actions, which may have <br />significant effects; nor does it represent a decision in principle about a future action. <br />Decision Notice and FONSI for Conger Rock Harvesting 4
The URL can be used to link to this page
Your browser does not support the video tag.