My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-02_REVISION - M1998022 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998022
>
2009-09-02_REVISION - M1998022 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:49 PM
Creation date
9/9/2009 3:33:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998022
IBM Index Class Name
REVISION
Doc Date
9/2/2009
Doc Name
Conversion application
From
The Gallegos Corporation
To
DRMS
Type & Sequence
CN1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SALAZ & ASSOCIA <br />INC. <br />203 Sunset Circle Palisade, Colorado 81526 Phone/Fax: (970) 464-ty4Z <br />June 21, 1998 <br />Mr. Richard Brinkley <br />Holy Cross Electric Association <br />P. 0. Drawer 2150 <br />Glenwood Springs, Colorado 81602 <br />Re: Conger Harvesting Area On Site Review <br />Dear Richard: <br />This letter confirms the on site review meeting held on June 1, 1998. Those attending the meeting <br />were Mr. Jeff Franke, Holy Cross Electric Association, Mr. Paul Hernandez, The Gallegos <br />Corporation, and Mr. William P. Balaz, Balaz & Associates, Inc. The parties inspected the site <br />and agreed that the terms of the Agreement dated May 4, 1998 specifying a maximum height of <br />fourteen (14) feet for any equipment or vehicular traffic crossing the Association's right of way <br />and the maintenance of four and one half (4 1/2) feet clearance from any conductor were <br />reasonable and would not cause any problems to the harvesting operation. The parties also <br />agreed that any removal of material or lowering of the grade under the powerline would not be a <br />problem so long as the above clearances were maintained. A five (5) feet diameter area of <br />undisturbed ground would be left around the base of all utility poles in the harvesting area. <br />Gallegos also agreed to work with the Association on any tree removal and that signs warning of <br />the overhead powerline would also be posted. <br />It is our understanding that this on site review meeting fulfills the agreement requirements. Thank <br />you for having Mr. Franke attend the meeting on short notice. <br />Please feel free to contact Mr. Glen Gallegos @ 970-926-1012 or the undersigned at the above <br />address if you have any questions regarding this transmittal. <br />Sincerely, <br />Balazz &Associates, QInc. <br />William P. Balaz Jr., P. E. <br />President <br />cc: Glen Gallegos, The Gallegos Corporation <br />Paul Hernandez, The Gallegos Corporation <br />file:\bill\gallegos\hcerm
The URL can be used to link to this page
Your browser does not support the video tag.