My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 9/9/2009, 8:10:41 AM-MR1
DRMS
>
Public
>
REVISION - 9/9/2009, 8:10:41 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:55 AM
Creation date
9/9/2009 8:52:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
8/31/2009
Doc Name
MD-02 approval
From
DRMS
To
American Shale Oil, LLC
Type & Sequence
MD2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost EstimatingSoftware <br />DEMOLITION WORK <br />aan.iFr.T inFNTIFICATION Agency or organization name: DRMS <br />Task #: 02a <br />State : Colorado Permitrob# : P-2008-046 <br />County : Rio Blanco Abbreviation :none <br />Site:A.M.S.O.Rd&D Project Filename:PO46-02a <br />Date : 19-Aug-2009 <br />User : THM <br />Permitting action : Final Reclamation Cost Estimate - MD-02 <br />Task description : Demolish and removal of gates, culverts, process equipment and structures <br />UNIT COSTS Last unit cost update March 2009 Location adjustment : 100.20% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-18"x 16' lenght culvert <br />-Gates at entrance of well pads 18 x16' <br />15'L x 5'H Pipe, CMP - 18 in. diam. <br />Gate Removal 64.00 <br />4.00 LF <br />Cst/Gate $2.4254 <br />$100.0000 $155.23 <br />$400.00 <br />-Diesle Tank 8'H x 25'L Haul to cert. dump - 9K-12K gal. 1.00 EA $1,160.0000 $1,160.00 <br />-Drilling Fluid Tank <br />-Propane Tanks <br /> <br />-Incinerator 8'H x 20'L <br /> <br />4'H x 10'L <br />15'H x 101 x 8'W Haul to cert. dump - 9K-12K gal. <br /> <br />Haul to Cert. dump <br />Demo./disp./appr. dump - to 60 mi. 1.00 <br /> <br />4.00 <br />1,200.00 EA <br /> <br />Cst/tnk <br />CF $1,160.0000 <br /> <br />$100.0000 <br />$1.1539 $1.160.00 <br /> <br />$400.00 <br />$1,384.68 <br />-8'x 40' Skids 8'W x 40'L Demo./disp./appr. dump - to 60 mi. 640.00 SF $1.2579 $805.06 <br />-Process Building <br />-Concrete Footers 40'W x 50'L x 16'H <br />Approx. 211 CY Demo./disp./appr. dump - to 60 mi. <br />Demo./disp. exs. pit, 1'x2'- 1OKft. 32,000.00 <br />150.00 CF <br />LF $1.2116 <br />$7.1467 $38, 771.80 <br />$1,072.01 <br />-Misc. tank and piping Various Sizes Load/5 mi. haul, slvg. - Steel fr. 500.00 CY $7.8700 $3,935.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $49,244 Total Cost (adjusted for location): $48,342
The URL can be used to link to this page
Your browser does not support the video tag.