Laserfiche WebLink
16. Pursuant to § 34-32.5-124 (7), C.R.S., the Board may impose a civil penalty of <br />not less than $100 per day nor more than $1,000 per day for each day during which the <br />violation occurs. Here, the Board may impose a penalty based on 46 days of violation (from <br />the inspection date of May 26.2009 to the August 12, 2009 hearing date) at 5100 to $1,000 <br />per day fora civil penalty of $4,600 to $46,000. <br />ORDER <br />Based on the foregoing findings of fact and conclusions of law, the Board hereby <br />fords that the Operator violated § 34-32.5-116(4)(.i). C.R.S., for failing to protect areas <br />outside of the affected land from slides or damage occurring during the mining operation aad <br />reclamation. The Board hereby issues a Cease and Resist Order prohibiting any further <br />activities at the site OW would further damage areas outside the affected boundaries. <br />Specifically prohibited are the stockpiling of unsold materials outside approved affected <br />areas and activities that contribute to sedimentation discharge from ;he site, <br />The Board imposes against the Opemor the following two corrective actions: <br />(1) The Board orders the Operator to provide all materials necessary to <br />allow Division approval of an amendment to or conversion of Permit <br />No. M-1999-058 addressing the incorporation of all lands affected by <br />the mining operation, specifically slurry areas, the containment area, and <br />the loud-out area, into the approved affected area within 180 days of the <br />signature date of the Board Order. <br />(2) The Board orders the Operator to provide a plan specific to the slurry <br />areas and the containment acceptable to the Division that addresses <br />reclamation of any off-site areas disturbed by mining operation that are <br />not to be incorporated in to Permit Number M-1999-058. The plan, at a <br />minimum, must include a map of the location, dimensions of the <br />disturbance, and reclamation measures to be implemented. <br />The Board imposes a civil penalty of $ I00 per day for 46 days for a total penalty of <br />$4,640.00. The total civil penalty shall be due and payable within thiny days ofthe signature <br />date of the Board Order. <br />DONE AND ORDERED this. day of 2009. <br />14 <br />FOR THE COLORADO <br />I;I07,1.707 <br />Colorado Stone Quarries, Inc. <br />Yule Marble Quarry <br />M-1999-058 <br />MV-2009-024 <br />60/E0 39Vd 13AaVW 39ViId3H ZZVZV9b0L6 0Z:bT 600Z/60/60