My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-04_ENFORCEMENT - M1999058
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1999058
>
2009-09-04_ENFORCEMENT - M1999058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:16 PM
Creation date
9/9/2009 8:52:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999058
IBM Index Class Name
ENFORCEMENT
Doc Date
9/4/2009
Doc Name
Board Order
From
DRMS
To
Colorado Stone Quarries, Inc.
Violation No.
MV-2009-023
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
violation occurs. Here, the Board may impose a penalty based on 46 days of violation (from <br />the inspection date of May 26, 2009 to the August 12, 2009 hearing date) at $100 to $1,000 <br />per day for a civil penalty of $4,600 to $46,000. <br />ORDER <br />Base on the foregoing findings Of fact and waclwions of law, the Board hmby <br />finds that the Operator violated § 34-32.5-116(4)(h), C.I.S., for failing to minimize <br />disturbances to the prevailing hydrologic balance of the affected land and the surrounding <br />area during the mining operation. The Board hereby issues a Cease and Desist Order <br />prohibiting any further activities at the site that would further damage the prevailing <br />hydrologic balance; the deposition of marble fires at the surface is specifically prohibited <br />until the corrective actions are complied with. <br />The Board imposes against the Operator the following three corrective actions. <br />(1) The Board orders the Operator to submit an interim bond increase in the <br />amount of $15,000 or if additional investigation determines a different <br />amount, that amount will be submitted within 30 days of the signature <br />date of the Board Order, <br />(2) The Board orders the Operator to provide all materials necessary to <br />allow Division approval of a technical revision of the reclamation perr,uit <br />within 45 days of the signature date of the Board Order addressing a <br />sedimentation control plan, including structural designs, constrxtion <br />details, a schedule of compliance and, if necessary, engineer <br />certifications for designs. <br />(3) The Board orders the Operator to provide as-built drawings and engineer <br />certifications for structures addressed in Corrective Action number two <br />above, <br />The Board imposes a civil penalty of $100 per day for 46 days for a total penalty of <br />$4,600.00_ The total civil penalty shall be due and payable within thirty days of the si$ nature <br />date of the signed Board Order. <br />DONE AND ORDERED this -i day of 1. C, 2009. <br />FOR THE COLORADO MINED <br />TION BOARD <br />"et r`son, Actiflg Clair <br />Land Reclamation Board <br />GolAr>?iQ Stone?rrics,lncy <br />Yule Marble Quarry <br />M-1999-058 <br />MV- 2099-023 <br />4 <br />E0/T0 39VJ 13AHVW 39a1I63H ZZVZVSVGL6 OT:bT 600Z/EO/60
The URL can be used to link to this page
Your browser does not support the video tag.