Laserfiche WebLink
violation occurs. Here, the Board may impose a penalty based on 46 days of violation (from <br />the inspection date of May 26, 2009 to the August 12, 2009 hearing date) at $100 to $1,000 <br />per day for a civil penalty of $4,600 to $46,000. <br />ORDER <br />Base on the foregoing findings Of fact and waclwions of law, the Board hmby <br />finds that the Operator violated § 34-32.5-116(4)(h), C.I.S., for failing to minimize <br />disturbances to the prevailing hydrologic balance of the affected land and the surrounding <br />area during the mining operation. The Board hereby issues a Cease and Desist Order <br />prohibiting any further activities at the site that would further damage the prevailing <br />hydrologic balance; the deposition of marble fires at the surface is specifically prohibited <br />until the corrective actions are complied with. <br />The Board imposes against the Operator the following three corrective actions. <br />(1) The Board orders the Operator to submit an interim bond increase in the <br />amount of $15,000 or if additional investigation determines a different <br />amount, that amount will be submitted within 30 days of the signature <br />date of the Board Order, <br />(2) The Board orders the Operator to provide all materials necessary to <br />allow Division approval of a technical revision of the reclamation perr,uit <br />within 45 days of the signature date of the Board Order addressing a <br />sedimentation control plan, including structural designs, constrxtion <br />details, a schedule of compliance and, if necessary, engineer <br />certifications for designs. <br />(3) The Board orders the Operator to provide as-built drawings and engineer <br />certifications for structures addressed in Corrective Action number two <br />above, <br />The Board imposes a civil penalty of $100 per day for 46 days for a total penalty of <br />$4,600.00_ The total civil penalty shall be due and payable within thirty days of the si$ nature <br />date of the signed Board Order. <br />DONE AND ORDERED this -i day of 1. C, 2009. <br />FOR THE COLORADO MINED <br />TION BOARD <br />"et r`son, Actiflg Clair <br />Land Reclamation Board <br />GolAr>?iQ Stone?rrics,lncy <br />Yule Marble Quarry <br />M-1999-058 <br />MV- 2099-023 <br />4 <br />E0/T0 39VJ 13AHVW 39a1I63H ZZVZVSVGL6 OT:bT 600Z/EO/60