Laserfiche WebLink
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil depth is from 0 to several feet. Any soil removed for site preparation will be <br />bermed and used to cover pits and cuttings during reclamation at depth approximately <br />equal to pre-disturbance. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Holes will be backfilled with cuttings to about 7 ft below surface 5' of concrete or foam <br />will be placed in the hole and the remainder backfilled to the surface with native material. <br />I any ground water is encountered non expected), bentonite will be used to seal the water <br />frain migrating up or down the hole. <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />NA <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />Washed out portions of the road will be repaired. Erosion control devices and methods <br />such as water bars will be used to prevent future damage. Future use is planned for this <br />road.