My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-04_REPORT - C1981041 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2009-09-04_REPORT - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:16 PM
Creation date
9/4/2009 2:28:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REPORT
Doc Date
9/4/2009
Doc Name
2008 Revegetation Review Letter
From
DRMS
To
Snowcap Coal Company
Permit Index Doc Type
Reveg Monitoring Report
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tor?3ra Hr?mand <br />September 4, 2009 <br />Page 3 <br />Plateau herbicide} was used at the Noah Decline with poor success, it naay be <br />prudent to request the input of BASF technical staff regarding passible reasons <br />why the prof ect was not successful. In general, a thorough effort should be made <br />to lean from the experience at the North Decline and nainin?ize the chances of <br />future failures. <br />• The species list suggested for interseeding will need to ?e revised prior to <br />submittal within a technical revision application to replace the three introduced <br />species crested wheatgra, Russian wildrye, and protxate l?ochia}with <br />appropriate native species, in order to qualify under the "normal husbandry" <br />intersceding provision of Rule 4,15.7?S??g}. <br />• location specific cheatgrass suppression plans and interseed?ng mr?es would <br />need to be addressed in the technical revision application. <br />Note that interseedin would extend the minimum time firame for band release in most, if not all <br />areas, given the need for two or rrtore years of cheatgrass suppression prior to interseeding, and <br />the requirement of Rule 4.1 ?.7?5}fig}, that the liability period extend for a minimum of years <br />after interseeding. <br />Please contact me or Dan Mathews if you have any questions. <br />Sincerely, <br />_ ? <br />? ?r <br />Michael P. ?oulay <br />Environmental Protection Specialist <br />Denver File
The URL can be used to link to this page
Your browser does not support the video tag.