Laserfiche WebLink
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Agency or organization name : Division Of Reclamation, Mining <br />Task #: 212 State : Colorado <br />Date : 1210312007 County :Moffat <br />User : JHB Site : Trapper Mine <br />sheet 1 of 2 <br />Permit or other job action : Rn5 <br />Task description : Replace topsoil on reclaimed facilities area <br />HOURLY EQUIPMENT COST <br />Description <br />Cost Br <br />And Safety <br />Permitfjob #: C-1981-010 <br />Abbreviation : none <br />Filename : C010-212 <br />Shift basis : 1 per day <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer :INA <br />Support equipment -Load area :ICat D10R - 10SU (2005) <br />-Dump area :ICat D10R - 10SU (2005) <br />How maintenance -Motor grader :NA <br />-Water truck :NA <br />?akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />GraderWa <br />Import data filename : scraper2 NA dozer dozer <br />% Utilization-machine : 100 NA 100 100 <br />-Ripper attachment. NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA $84.86 $84.86 n <br />Operating cost/hour : $177.86 NA $138.49 $138.49 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 <br />Operato <br />r cost/hour <br />$24.95 <br />NA <br />$32.78 <br />$32.78 <br />Unit subtotals $313.18 NA $256.13 $256.13 <br />Number of units : 4 0 1 1 0 0 <br />Group subtotals : Work : $1,252.71 Support: $512.26 Maintenance : $0.00 <br />Total work team cost/hour : $1,764.96 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 44,367 CCY <br />factor : 1.125 volume : 49,913 LCY <br />Source of quantity take-off :Map 9, Appendix A production summaries <br />Source of estimated swell factor : cat