Laserfiche WebLink
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />.User <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />210 State : Colorado Permit/job #: C-1981-010 <br />1210312007 County :Moffat Abbreviation :none <br />JHB Site : Trapper Mine Filename : C010-210 <br />Permit or other job action : Rn5 <br />Task description :Replace topsoil on reclaimed Pit DIE haulroads <br />; :..::....:..:...:...: <br />..........::.::::..::.:.:..::..:. <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper <br />-Push dozer <br />Support equipment -Load area <br />-Dump area <br />Cost Bn <br />ipment Description <br />637G w/push-pull <br />D10R - 10SU (2005) <br />D10R - 10SU (2005) <br />Road maintenance -Motor grader :?NA <br />-Water truck :NA <br />>akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br /> <br />Load area Dump area Road Maintenance Equipment <br /> <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer NA NA <br />% Utilization-machine : 100 NA 100 100 NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA $84.86 $84.86 NA NA <br /> <br />Operating cost/hour : <br />$177.86 <br />NA <br />$138.49 $138.49 <br />NA <br />NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $24.95 NA $32.78 $32.78 NA NA <br />Unit subtotals : $313.18 NA $256.13 $256.13 NA NA <br />Number of units : 4 0 1 1 0 0 <br />Group subtotals : Work : $1,252.71 Support : $512.26 Maintenance : $0.00 <br />Total work team cost/hour : $1,764.96 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 44,044 CCY <br />factor : 1.125 volume : 49,550 LCY <br />sheet 1 of 2 <br />Source of quantity take-off :Map 9, Appendix A production summaries <br />Source of estimated swell factor : Caterpillar Handbook Edition 34