Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />209 State : Colorado Permit/job #: C-1981-010 <br />1210312007 County : Moffat Abbreviation : none <br />JHB Site : Trapper Mine Filename : C010-209 <br />Permit or other job action : Rn5 <br />Task description :Replace Tposoil on Reclaimed F-Pit haulroads <br />.::... . <br />HOURLY EQUIPMENT COST <br />Support equipment -Load area :ICat D10R - 10SU (2005) <br />-Dump area :Cat D10R - 10SU (2005) <br />Cost Bn <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer :INA <br />Road maintenance -Motor grader :INA <br />-Water truck :INA <br />!akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer NA NA <br />% Utilization-machine : 100 NA 100 100 NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA $84.86 $84.86 NA NA <br />Operating cost/hour : $177.86 NA $138.49 $138.49 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $24.95 NA $32.78 $32.78 NA NA <br />Unit subtotals : $313.18 NA $256.13 $256.13 NA NA <br />Number of units : 4 0 1 1 0 0 <br />Group subtotals : Work : $1,252.71 Support: $512.26 Maintenance : $0.00 <br />Total work team cost/hour : $1,764.96 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 56,114 CCY <br />factor : 1.125 volume : 63,128 LCY <br />Source of quantity take-off :Map 9, Appendix A production summaries <br />Source of estimated swell factor : cat <br />Description <br />Shift basis : 1 per day