My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />206 State : Colorado Permit/job #: C-1981-010 <br />12/03/2007 County : Moffat Abbreviation :none <br />JHB Site : Trapper Mine Filename : &010-206 <br />Permit or other job action :2005 Mt <br />Task description : Replace topsoil on Reclaimed East A Pit haulroad <br />HOURLY EQUIPMENT COST <br />Scraper work team -Scraper <br />-Push dozer <br />Cost Bn <br />Description <br />Shift basis : 1 per day <br />637G <br />Support equipment -Load area : Cat DIOR - 10SU (2005) <br />-Dump area :Cat DIOR - IOSU (2005) <br />HOW maintenance -Motor grader : NA <br />-Water truck :INA <br />mkdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer NA NA <br />% Utilization-machine : 100 NA 100 100 NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA $84.86 $84.86 NA NA <br />Operating cost/hour : $177.86 NA $138.49 $138.49 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator costthour : $24.95 NA $32.78 $32.78 NA NA <br />Unit subtotals : $313.18 NA $256.13 $256.13 NA NA <br />Number of units : 2 0 1 1 0 0 <br />Group subtotals : Work : $626.35 Support : $512.26 Maintenance : $0.00 <br />Total work team cost/hour : $1,138.61 <br />.: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,841 CCY factor : 1.125 volume : 11.071 LCY <br />Source of quantity take-off :Map 9, Appendix A production summaries <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br />sheet 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.