My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />205 State : Colorado Permitrob #: C-1981-010 <br />1210312007 County: Moffat Abbreviation : none <br />JHB Site : Trapper Mine Filename : C010-205 <br />Permit or other job action : Rn5 <br />Task description :replace topsoil on reclaimed LOM Haulroad <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bn <br />Scraper work team -Scraper :ICat 637G w/push-pull <br />-Push dozer :NA <br />Support equipment -Load area : Cat D10R - 10SU (2005) <br />-Dump area :ICat D10R - 10SU (2005) <br />Road maintenance -Motor grader :NA <br />-Water truck : NA <br />iakdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrapei2 NA dozer dozer NA NA <br />% Utilization-machine : 100 NA 100 100 NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA $84.86 $84.86 NA NA <br />Operating cost/hour : $177.86 NA $138.49 $138.49 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $24.95 NA $32.78 $32.78 NA NA <br />Unit subtotals : $313.18 NA $256.13 $256.13 NA NA <br />Number of units : 4 0 1 1 0 0 <br />Group subtotals : Work : $1,252.71 Support: $512.26 Maintenance : $0.00 <br />Total work team cost/hour : $1,764.96 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 45,980 CCY <br />factor : 1.125 volume : 51,728 LCY <br />Source of quantity take-off :Appendix A production summaries <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br />sheet 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.