Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: 200 <br />Date : 1210412007 <br />User: JHB <br />State : Colorado <br />Permitfjob# : C-1981-010 <br />County:Moffat Abbreviation :none <br />Site : Trapper Mine Filename : C010-200 <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Regrade cutffill slopes for A-1 hau/road <br />............................. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D1 IR - 11 SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 2 per day <br />Attachment no. 2 :NA <br /> Data source: <br />(CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $95.90 NA <br /> Operating cost/hour : $224.59 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.93 NA <br /> Total unit cost/hour : $353.42 Total fleet cost/hour : $706.84 <br /> <br />MATERIAL QUANTITIES ...... . <br />Initial Swell Loose <br />volume : 349,955 CCY factor : 1.090 volume : 381,451 LCY <br /> <br />Source of estimated volume: Fig. 3.7-1 <br />Source of estimated swell factor : cat <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 4,351.4 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.81 (2 shifts/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.95 (Cat HB) <br />Average push gradient : 3.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,500 feet Material weight : 0.88 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,600 Ibs/LCY Net correction : 0.37 <br />Weight description : <br />Clay and gravel - Wet Adjusted unit production : 1595.88 LCY/hr <br /> Adjusted fleet production : 3,191.77 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size : 2 Dozer(s) Total job time : 119.51 Hours <br />Unit cost : $0.221 /LCY Total job cost : $84,475 <br />