My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Regrade cut/fill slopes on LOM haulroad <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 2 per day <br />Attachment no. 2 : NA <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $95.90 NA <br /> Operating cost/hour : $224.59 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.93 NA <br /> Total unit cost/hour : $353.42 Total fleet cost/hour : $1,413.68 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 265,289 CCY factor : 1.090 volume : 289,165 LCY <br /> <br />Source of estimated volume: Figure 3.7-1 <br />Source of estimated swell factor :cat <br /> <br />...: <br /> <br />HOURLY PRODUCTION <br /> <br />Job Condition Correction Factors <br />,..: <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 4,351.4 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.81 (2 shifts/day) <br />Compacted till or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.95 (Cat HB) <br />Average push gradient : 3.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,500 feet Material weight : 0.96 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,400 lbs/LCY Net correction : 0.40 <br />Weight description : <br />Clay and gravel - Dry <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />1728.88 LCY/hr <br />6,915.50 LCY/hr <br />41.81 Hours <br />Unit cost : $0.204 /LCY Total job cost : $59,111
The URL can be used to link to this page
Your browser does not support the video tag.