Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />............ <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />182 State :Colorado Permitrob #: C-1981-010 <br />1113012007 County : Moffat Abbreviation : none <br />JHB Site : Trapper Mine Filename : C010-182 <br />Permit or other job action : Rn5 <br />Task description : Replace topsoil on DIE pit disturbance <br />.......... ..:.:........... ....... ........... <br />HOURLY EQUIPMENT COST <br />Shift basis : 2 per day <br />Cost Bre <br />Scraper work team -Scraper <br />-Push dozer <br />Road maintenance -Motor grader <br />-Water truck <br />Support equipment -Load area <br />-DumD area <br />637G w/push-pull <br />'DI IR - 11 SU (2005) <br />'DI IR - 11 SU (2005) <br />T 16H <br />ter Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer grader misctruk <br />% Utilization-machine : 100 NA 100 100 100 50 <br />-Ripper attachment: ; NA NA NA NA NA NA <br />Ownerhip cost/hour : $66.56 NA $95.90 $95.90 $34.26 $14.10 <br />Operating cost/hour : $177.86 NA $224.59 $224.59 $63.52 $17.36 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 NA <br />Operator cost/hour : $25.10 NA $32.93 $32.93 $24.62 $34.09 <br />Unit subtotals : $269.52 NA $353.42 $353.42 $122.40 $65.55 <br />Number of units : 10 0 2 2 1 1 <br />Group subtotals : Work : $2,695.22 Support: $1,413.68 Maintenance : $187.94 <br />Total work team cost/hour : $4,296.84 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 533,333 CCY factor : 1.125 volume : 600,000 LCY <br />Source of quantity take-off : Permit Map 10B <br />Source of estimated swell factor : cat