My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Material description <br />Earth - Dry packed <br />Rated payload : 75,000 pounds <br />Payload capacity: 29.41 LCY <br />Cycle Time : <br />Scraper loading time * : 1.00 minutes <br />Maneuver and spread time : 0.60 minutes <br />* load time per scraper pair on push-pull models <br />Heaped volume : <br />Average volume <br />Adjusted capacity <br />34.00 LCY <br />29.00 LCY <br />29.00 LCY ••• <br />hourly production reflects volume per scraper pair on push-pull models <br />Job Condition Corrections : Site altitude (ft.) : 7,000 <br /> Scraper Push dozer Source <br />Altitude adj.: 1.000 NA (Cat HB) <br />Job efficiency : 0.810 NA (Cat HB) <br />Net correction : 0.810 NA <br />Travel time : <br />Road condition description : Rutted dirt, little maintenance, no water, 1 "fire penetration <br />i_i_.A o....6.. <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,000 4.00 3.00 7.00 1362 0.81 <br />2 1,500 -2.00 4.00 2.00 2939 0.66 <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 7.41 <br />Dnf -r., r^i ifc <br />minutes <br />1 1,500 2.00 4.00 6.00 2638 0.76 <br />2 1,000 -4.00 3.00 -1.00 2972 0.61 <br /> <br /> <br /> <br /> <br /> <br /> <br />** travel time for each segment is adjusted for acceleration/deceleration. <br />Return time : 7.Jr <br />minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 4.44 minutes <br />Unadjusted unit production/hour : 784.10 LCY/hour *** Adjusted for job conditions : 635.12 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 635.12 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 3,175.62 LCY/hour <br /> :XX <br />.. <br />JOB TIME AND COST <br />Fleet size : 5 Team(s) Total job time : 337.50 Hours <br />Unit cost : $1.353 /LCY Total job cost : $1,450,165 <br />
The URL can be used to link to this page
Your browser does not support the video tag.