Laserfiche WebLink
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Regrade Sage #1 Pond <br />HOURLY EQUIPMENT COST <br />Horsepower : 570 <br />Shiftbasis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.15 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $268.42 Total fleet cost/hour : $268.42 <br /> <br />MATERIAL QUANTITIES .::.: .. ..:.:: .. . <br />Initial Swell Loose <br />volume : 3,556 CCY factor : 1.125 volume : 4,000 LCY <br /> <br />Source of estimated volume: Appendix A Table A-3 <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br /> <br />. _ <br />HOURLY PRODUCTION ...... . ..... .. <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.85 (user) <br />Average push distance : 75 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 2,105.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,475 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.46 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 970.78 LCY/hr <br /> Adjusted fleet production : 970.78 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 4.12 Hours <br />Unit cost : $0.276 /LCY Total job cost : $1,106 <br /> <br />Basic machine : Cat D10R - 10SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :1-shank ripper